The project is located in Selangor, Malysia and the Owner is Malysia State Grid Corporation. One set of tandem -compound combined-cycle 9F dual-fuel turbine is newly installed for the project. The design capacity is 384.7MW. Both its design and construction are based on European and American standards, and its BTG equipment is imported from abroad.
SHANDONG ELECTRIC POWER ENGINEERING CONSULTING INSTITUTE CORP.,LTD.