The power plant is located in Sahiwal city, Punjab, Pakistan. 2×660MW ultra-supercritical coal-fired units are installed for this phase. It is going to operate by the end of 2017 and the estimated annual power generating capacity could reach 9 billion kwh.
SHANDONG ELECTRIC POWER ENGINEERING CONSULTING INSTITUTE CORP.,LTD.